Settlement Alerts:
$3,700,000 Sexual Assault by Teacher • $3,350,000 Medical Malpractice • $2,737,000 Industrial Accident Premiere Liability and Products • $1,750,000 Sexual Assault by Medical Provider • $1,500,000 Auto Accident • $1,500,000 Auto No Fault Case • $1,462,000 Automobile Accident • $1,350,000 Auto Accident • $950,000 Premises Liability • $950,000 Employment Discrimination • $770,000 Deliberate Indifference Jail • $675,000 Sexual Assault • $650,000 Automobile Accident • $535,000 Employment Discrimination-Race • $500,000 Employment Discrimination-Sexual Orientation • $500,000.00 Employment Discrimination • $450,000.00 Civil Litigation • $400,000 Auto Accident • $330,000 Civil Rights • $300,000 Employment Discrimination • $285,000 Premises Liability • $275,000 Motorcycle Accident • $250,000.00 Auto-1st and 3rd Combined • $235,000 Auto Accident • $225,000 Premises Liability • $225,000.00 Family Law • $225,000.00 Auto-1st and 3rd Combined • $225,000.00 Auto-1st and 3rd Combined • $193,000 Auto Accident • $185,000 Auto Accident • $175,000.00 Auto-1st and 3rd Combined • $175,000.00 Auto-1st and 3rd Combined • $150,000 Security Guard Harassment • $100,000.00 Auto-1st and 3rd Combined • $92,500.00 Auto - 1P • $75,000.00 Employment Discrimination
View All
Rasor Law Firm, PLLC

Michigan Construction Defects: Options to Hold Builders Accountable

TL;DR: If you suspect a construction defect, document conditions early, avoid destroying evidence during repairs, review your contract and warranties, and consider a qualified independent inspection. Michigan deadlines can vary by claim type and may be affected by statutes of limitation and (for many construction participants) a statute of repose, so early legal review can matter.

What Counts as a Construction Defect?

A construction defect generally refers to a condition caused by how a project was designed, built, installed, supervised, or repaired, especially where the work departs from the contract, applicable code requirements, or accepted construction practices. Some issues are obvious (like an active roof leak). Others are concealed (like improper flashing behind siding) and may not become apparent until damage progresses.

Common Issues Michigan Property Owners Report

Many disputes involve the building envelope (the systems intended to keep water and air out), structural components, and mechanical systems. Examples include:

  • Water intrusion: roof leaks; window/door leaks; missing/incorrect flashing; poor grading and drainage
  • Foundation and structural issues: cracking; settlement; improper framing; undersized beams; truss concerns
  • Exterior problems: siding failures; masonry cracking; deck/balcony deficiencies; improper sealants
  • Interior damage tied to moisture: staining; warped floors; damaged drywall; conditions consistent with mold growth
  • Mechanical and safety concerns: HVAC/ventilation problems; electrical defects; plumbing leaks

Not every crack or cosmetic issue is necessarily a legal defect. The analysis often focuses on cause (workmanship/design/materials vs. maintenance or normal movement), compliance (contract/specifications/code), and whether there is measurable damage or a meaningful risk of damage.

Who May Be Responsible?

Depending on project structure and facts, responsibility may extend beyond the person you interacted with day-to-day. Potentially responsible parties may include:

  • General contractors and subcontractors
  • Builders and developers
  • Architects, engineers, and other design professionals
  • Manufacturers or suppliers (in product-related scenarios)
  • In limited situations, prior owners or flippers (often depending on disclosures, contracts, and what they knew or did)

Practical Steps to Protect Your Position

Defect claims can become more difficult and expensive when damage spreads or evidence is lost. These steps can help preserve your options.

Document conditions and communications

Take dated photos/video, keep a timeline, and save emails/texts, invoices, plans, permit/inspection documents, and warranty materials.

Mitigate ongoing damage (carefully)

Reasonable temporary measures (tarps, dehumidifiers, shutting off water, etc.) can help prevent escalation. Avoid unnecessary demolition or exploratory tear-outs unless a qualified professional advises it is needed and you have preserved evidence first.

Consider an independent evaluation

A qualified building-envelope consultant, structural engineer, or other appropriate expert may help identify likely causes and repair options.

Tip: Preserve evidence before permanent repairs

If immediate repairs are unavoidable, document thoroughly beforehand and retain removed materials when feasible. Permanent repairs can eliminate key evidence.

Checklist: What to gather before you call a lawyer or expert

  • Contract(s), change orders, and scope documents
  • Warranty documents and any warranty registration materials
  • Permits, inspection records, and as-built plans (if available)
  • Photos/videos (dated) and a written timeline of symptoms
  • Repair invoices, contractor proposals, and communications
  • Product info (model numbers, manufacturer instructions, data sheets)

Legal Theories That May Apply in Michigan

Construction defect disputes commonly involve contract-based and non-contract theories. Depending on facts and parties, potential claims may include:

  • Breach of contract: failure to perform as promised
  • Breach of warranty: express warranties; in some residential new-home contexts, Michigan recognizes an implied warranty of habitability/workmanlike construction in the builder-vendor setting (often discussed under Weeks v. Slavik Builders, Inc.)
  • Negligence: substandard work that falls below applicable standards and causes compensable damage (often subject to Michigan limitations rules and the statute of repose discussed below)
  • Misrepresentation/nondisclosure: where inaccurate statements or concealment regarding work or known defects are proven
  • Product-related claims: where a product defect, or installation inconsistent with manufacturer requirements, caused or contributed to failure

Timing Considerations (Why Acting Promptly Matters)

Michigan time limits can vary based on claim type, contract terms, and when the issue was (or should have been) discovered. Examples of potentially relevant timing rules include:

  • Contract limitation periods: many contract actions are subject to a six-year period. See MCL 600.5807.
  • Tort limitation periods: many property-damage tort claims are subject to a three-year period. See MCL 600.5805.
  • Statute of repose for many construction participants: claims against those performing or furnishing the design, planning, supervision, or construction of improvements to real property are commonly subject to a six-year repose period (with a limited additional period in certain circumstances). See MCL 600.5839.
  • Goods/product timing (UCC): if the dispute is treated as a sale of goods, a four-year limitation period may apply. See MCL 440.2725.

How Claims Often Proceed

Many matters begin with an investigation and a written demand. Resolution options may include negotiated repairs, settlement, mediation, arbitration (if required by contract), or litigation.

FAQ

Do I have to let the builder come back to fix the problem?

It depends on your contract and warranty terms. Even when you are not required to accept a repair proposal, preserving evidence and documenting conditions before any work is performed can be critical.

Should I keep living in the home if there is water intrusion or suspected mold?

Safety and health come first. Consider consulting appropriate professionals for assessment and mitigation while you preserve documentation and evaluate legal options.

Can I pursue multiple parties (GC, subs, designer, manufacturer)?

Potentially, yes. Responsibility often depends on the cause of the failure, the scopes of work, and the project documents.

What if I already repaired part of the problem?

You may still have options, but missing documentation or discarded materials can make proving cause and damages harder. Gather what you can (photos, invoices, removed materials if available) and consider early legal review.

How We Can Help

Construction defect disputes often require coordinating legal analysis with technical investigation. We can assist by reviewing contracts and warranties, identifying potentially responsible parties, coordinating with qualified experts, preserving evidence, and pursuing negotiation, ADR, or litigation strategies aligned with your goals.

Ready to talk? Contact us to discuss next steps.

Michigan disclaimer: This post is general information, not legal advice, and does not create an attorney-client relationship. Construction-defect rights and deadlines in Michigan can turn on contracts, claim type, and timing (including statutes of limitation and repose). Consult a Michigan attorney about your specific facts before making major repairs or taking legal action.

Legal Services